West Exchange Tower for HKTC, IL 6691, Des Voeux Road Central, Hong Kong
Project Items
- P&T-215-001 Perspective drawing
- P&T-215-002 East elevation
- P&T-215-003 East elevation
- P&T-215-004 Block plan and notes
- P&T-215-005 Basement plan
- P&T-215-006 Ground floor plan
- P&T-215-007 1st floor plan
- P&T-215-008 2nd floor plan
- P&T-215-009 3rd floor plan
- P&T-215-010 4th floor plan
- P&T-215-011 5th & 7th floor plan
- P&T-215-012 6th floor plan
- P&T-215-013 8th floor plan
- P&T-215-014 9th floor plan
- P&T-215-015 9th floor plan
- P&T-215-016 10th floor plan
- P&T-215-017 11th to 23rd floor plan
- P&T-215-018 24th floor plan
- P&T-215-019 Roof plan
- P&T-215-020 Roof plan
- P&T-215-021 Upper roof plan
- P&T-215-022 Section A-A
- P&T-215-023 Section B-B
- P&T-215-024 East elevation
- P&T-215-025 South elevation
- P&T-215-026 West elevation
- P&T-215-027 North elevation
- P&T-215-028 Calculation & schedules
- P&T-215-029 Calculation & schedules
- P&T-215-030 Gross floor area calculation
- P&T-215-031 Usable floor area calculation
- P&T-215-032 Block plan & section
- P&T-215-033 Provision of telephone duct crossing at (1) Morrision Street, (2) Wing Lok Street (for main contractors information only)
- P&T-215-034 Hook, bar, ladder and anchor iron for use in the manhole or joint box
- P&T-215-035 Construction method of lead-in into cable chamber (gland caulking international ∅114 mm)
- P&T-215-036 Construction method of lead-in into cable chamber (gland caulking international ∅114 mm)
- P&T-215-037 Frame & cover: security type with pad bolts for cable chamers
- P&T-215-038 Details of flat top counter unit: stamps and registration remittances and payments parcels
- P&T-215-039 Details of stainless steel cabinet, for custody of counter sub-stock
- P&T-215-040 Detail of standard self service suite
- P&T-215-041 Lockable post office box unit (type 1 & 2): details of form cupboard, drying rack, shelves, door with hatch window
- P&T-215-042 Details of illuminated glazed cabinet, writing shelf, H.W. storage rack, wooden buffer, small packet posting box
- P&T-215-043 Hoarding plan, section, elevation (for demolition work)
- P&T-215-044 Hoarding plan, section, elevation (for superstructure contract)
- P&T-215-045 Hoarding plan, section, elevation (for superstructure contract)
- P&T-215-046 Hoarding
- P&T-215-047 Basement plan
- P&T-215-048 Ground floor plan
- P&T-215-049 1st floor plan
- P&T-215-050 1st floor plan
- P&T-215-051 2nd floor plan
- P&T-215-052 2nd floor plan
- P&T-215-053 3rd floor plan
- P&T-215-054 3rd floor plan
- P&T-215-055 4th floor plan
- P&T-215-056 4th floor plan
- P&T-215-057 5th & 7th floor plan
- P&T-215-058 5th & 7th floor plan
- P&T-215-059 6th floor plan
- P&T-215-060 6th floor plan
- P&T-215-061 8th floor plan
- P&T-215-062 8th floor plan
- P&T-215-063 9th floor plan
- P&T-215-064 9th floor plan
- P&T-215-065 10th floor plan
- P&T-215-066 10th floor plan
- P&T-215-067 11th to 22nd floor plan
- P&T-215-068 11th to 22nd floor plan
- P&T-215-069 23rd floor plan
- P&T-215-070 23rd floor plan
- P&T-215-071 Roof plan
- P&T-215-072 Roof plan
- P&T-215-073 Upper roof plan
- P&T-215-074 Upper roof plan
- P&T-215-075 Section A-A
- P&T-215-076 Section A-A
- P&T-215-077 Section B-B
- P&T-215-078 Section B-B
- P&T-215-079 East elevation
- P&T-215-080 East elevation
- P&T-215-081 East elevation
- P&T-215-082 South elevation
- P&T-215-083 South elevation
- P&T-215-084 South elevation
- P&T-215-085 West elevation
- P&T-215-086 West elevation
- P&T-215-087 West elevation
- P&T-215-088 North elevation
- P&T-215-089 North elevation
- P&T-215-090 North elevation
- P&T-215-091 Roof plan: concrete plinth layout
- P&T-215-092 Plan: stair 1 to 4
- P&T-215-093 Plan: stair 1 & 2
- P&T-215-094 Plan: stair 1 & 2
- P&T-215-095 Plan: stair 1 & 2
- P&T-215-096 Section (stair 1-4)
- P&T-215-097 Plan: stair 5
- P&T-215-098 Plan: stair 5
- P&T-215-099 Exchange internal stair details
- P&T-215-100 Lavatory plan & section (11th floor to 23rd floor)
- P&T-215-101 Lavatory plan & sections (2nd floor, 4th floor, 6th floor, 8th floor, 9th floor & 10th floor)
- P&T-215-102 Lavatory plan & sections (ground floor & 1st floor)
- P&T-215-103 Water tank detail
- P&T-215-104 Water tank detail
- P&T-215-105 Water tank detail
- P&T-215-106 Water tank detail
- P&T-215-107 Water tank detail
- P&T-215-108 Details of trenches in transformer room
- P&T-215-109 11th to 23rd floor plan (reflected ceiling plan)
- P&T-215-110 24th floor plan (reflected ceiling plan)
- P&T-215-111 Typical office floor section
- P&T-215-112 24th floor section
- P&T-215-113 Post office tile layout
- P&T-215-114 Counter elevation
- P&T-215-115 Entrance door elevation
- P&T-215-116 Reflected ceiling plan
- P&T-215-117 Public lobby plan
- P&T-215-118 Details of reception counter, P.O.S.S. door
- P&T-215-119 Section for entrance lobby
- P&T-215-120 Section for entrance lobby
- P&T-215-121 Typical lift lobby plan & section (office floor)
- P&T-215-122 Schematic line diagram for drainage
- P&T-215-123 9th & 10th floor plan (drainage)
- P&T-215-124 Area required to be excavated for the diversion of services & utilities