Transporting gravels, Ma Pau Ling, Pat Heung 八鄉麻包嶺搬運碎石

元朗八鄉麻包嶺開鑿隧道的工程,岩石打成碎石後由小卡車運出隧道。In a tunnel construction site at Ma Pau Ling in Pat Heung, porphyritic granites dug from the tunnel are crushed into gravels and carried away by small rail cart.
hku lib logo
Contact us 

Copyright © 2024 The University of Hong Kong. All Rights Reserved.