Bevaloid (Far East) Factory, Tai Po Industrial Estate, Tai Po New Territories
Project Items
- P&T-037-001 Plan ground floor
- P&T-037-002 Escalators detail and cross sections plan
- P&T-037-003 Plan second floor
- P&T-037-004 Plan first floor
- P&T-037-005 Cross sections plan
- P&T-037-006 Elevations plan
- P&T-037-007 Column layout plan
- P&T-037-008 Floor plan
- P&T-037-009 Ground floor plan
- P&T-037-010 First floor plan
- P&T-037-011 Second floor plan
- P&T-037-012 Roof plan
- P&T-037-013 Elevations
- P&T-037-014 Elevations
- P&T-037-015 Sections
- P&T-037-016 Upper roof plan
- P&T-037-017 Plot ratio, calculations, general notes
- P&T-037-018 Hoarding plans & details
- P&T-037-019 Layout & detail of boundary way
- P&T-037-020 Detail of pantry
- P&T-037-021 Detail of switch room & transformer room
- P&T-037-022 Layout of chemical reactors
- P&T-037-023 Layout of chemical reactors
- P&T-037-024 Layout of chemical reactors
- P&T-037-025 Layout of chemical reactors
- P&T-037-026 Catwalk layout for chemical reactors
- P&T-037-027 Catwalk layout for chemical reactors
- P&T-037-028 Vertical drainage line diagram & block plan
- P&T-037-029 Ground floor plan (drainage)
- P&T-037-030 First floor plan (drainage)
- P&T-037-031 Vertical plumbing line diagram
- P&T-037-032 Ground floor plan plumbing layout
- P&T-037-033 Electrical wiring diagram
- P&T-037-034 Electrical detail diagram sheet (1)
- P&T-037-035 Electrical detail diagram sheet (2)
- P&T-037-036 Electrical layout for ground floor plan
- P&T-037-037 Cable route for ground floor plan
- P&T-037-038 Schematic diagram for sprinkler drencher & fire hydrant/hose reel system
- P&T-037-039 Sections
- P&T-037-040 Ground floor plan
- P&T-037-041 1st floor plan
- P&T-037-042 2nd floor plan
- P&T-037-043 Section & elevation
- P&T-037-044E Roof plan
- P&T-037-045E Ground floor plan
- P&T-037-046E Ground floor plan
- P&T-037-047E First floor plan
- P&T-037-048E First floor plan
- P&T-037-049E Second floor plan
- P&T-037-050E Second floor plan
- P&T-037-051E Second floor plan
- P&T-037-052E Second floor plan
- P&T-037-053E Roof plan
- P&T-037-054E Elevations
- P&T-037-055E Elevations
- P&T-037-056E Elevations
- P&T-037-057E Elevations
- P&T-037-058E Elevations
- P&T-037-059E Sections
- P&T-037-060E Sections
- P&T-037-061E Plot ratio, calculations, general notes
- P&T-037-062E Plot ratio, calculations, general notes
- P&T-037-063E Hoarding for building work: plans & details
- P&T-037-064E Detail of stair no.1
- P&T-037-065E Detail of stair no.1
- P&T-037-066E Detail of stair no.1
- P&T-037-067E Detail of stair no.1
- P&T-037-068E Detail of stair no.1 section C-C
- P&T-037-069E Detail of stair no.2
- P&T-037-070E Detail of stair no.2 section B-B
- P&T-037-071E Detail of stair no.3
- P&T-037-072E Detail of stair no.3 section A-A
- P&T-037-073E Detail of lavatories
- P&T-037-074E Detail of lavatories
- P&T-037-075E Second floor plan (drainage)
- P&T-037-076E Roof plan (drainage)
- P&T-037-077E Upper roof plan (drainage)
- P&T-037-078E First floor plan plumbing layout
- P&T-037-079E Second floor plan plumbing layout
- P&T-037-080E Roof plan plumbing layout
- P&T-037-081E Upper roof plan plumbing layout
- P&T-037-082E Cable route for second floor plan
- P&T-037-083E Cable route for roof plan
- P&T-037-084E Upper roof plan cable route
- P&T-037-085E Electrical layout for first floor plan
- P&T-037-086E Electrical layout for second floor plan
- P&T-037-087E Electrical layout for roof plan
- P&T-037-088E Cable route for first floor plan
- P&T-037-089E Fire service, sprinkler & drencher layout for ground floor
- P&T-037-090E Fire service, sprinkler & drencher layout for ground floor
- P&T-037-091E Fire service, sprinkler & drencher layout for first floor
- P&T-037-092E Fire service, sprinkler & drencher layout for first floor
- P&T-037-093E Fire service, sprinkler & drencher layout for second floor
- P&T-037-094E Fire service, sprinkler & drencher layout for second floor
- P&T-037-095E Fire service, sprinkler & drencher layout for root floor
- P&T-037-096E Fire service, sprinkler & drencher layout for root floor
- P&T-037-097E Automatic B.C.F. system for D.G. store & transformer room
- P&T-037-098E Schematic diagram for fire alarm system
- P&T-037-099E Ventilating & A/C layout for ground floor plan
- P&T-037-100E Ventilating & A/C layout for first floor plan
- P&T-037-101E Ventilating & A/C layout for second floor plan
- P&T-037-102E Ventilating & A/C layout for roof plan
- P&T-037-103E Column layout plan
- P&T-037-104E 3rd, 4th & 5th floor plan
- P&T-037-105E Ground floor reinforcement details
- P&T-037-106E Foundation plan & bottom slab reinforcement details
- P&T-037-107E Raft beam details (Sheet 1 of 2)
- P&T-037-108E Raft beam details (Sheet 2 of 2)
- P&T-037-109E Details of site excavation & compaction
- P&T-037-110E Sump tank details
- P&T-037-111E Foundation plan & bottom slab reinforcement details
- P&T-037-112E Raft beam rein ft. splicing details
- P&T-037-113E Ground & 1st floor framing plan
- P&T-037-114E 2/F, roof & upper roof framing plan
- P&T-037-115E Ground floor reinforcement details
- P&T-037-116E 1st floor top reinforcement details
- P&T-037-117E 1st floor bottom reinforcement details
- P&T-037-118E 2nd floor top reinforcement details
- P&T-037-119E 2nd floor bottom reinforcement details
- P&T-037-120E Roof top reinforcement details
- P&T-037-121E Roof bottom reinforcement details
- P&T-037-122E Cable trench details
- P&T-037-123E Beam details sheet 1 of 2
- P&T-037-124E Beam details sheet 2 of 2
- P&T-037-125E Structural steel details of support to chemical reactors
- P&T-037-126E Column schedule
- P&T-037-127E Wall details
- P&T-037-128E R.C. details of staircase no.1
- P&T-037-129E R.C. details of staircase no.2 & 3
- P&T-037-130E Water tank details sheet 1 of 2
- P&T-037-131E Water tank details sheet 2 of 2
- P&T-037-132E Details of hoists and support systems
- P&T-037-133E Layout & detail of boundary wall