Menu
HKUL
Login
Home
/
Collections
/
Palmer and Turner (P&T Group) Collection
Telephone Exchange Building K.T.I.L. 256 Kwun Tong
Project Items
P&T-230-001 Ground floor, 1st floor plans and sections
P&T-230-002 Details of hoarding
P&T-230-003 2nd floor & flat roof plans, north & west elevations
P&T-230-004 Block plan, south & east elevations, diagrams & calculations
P&T-230-005 Details of M.S. track & roller
P&T-230-006 Details of cable trench
P&T-230-007 Details of cable trench
P&T-230-008 Details of cable connecting chamber
P&T-230-009 Amended cable connecting chamber detail
P&T-230-010 Details of rolling shutter
P&T-230-011 Details of steel windows
P&T-230-012 Details of doors
P&T-230-013 Ironmongery schedule
P&T-230-014 Details of staircase no.1
P&T-230-015 Details of staircase no.1
P&T-230-016 Details of staircase no.1
P&T-230-017 Details of staircase no.2
P&T-230-018 Details of staircase no.2
P&T-230-019 Details of M/S. gates steel door and M/S. grille
P&T-230-020 Details of hoisting beam and metal louvres
P&T-230-021 Details of R.C. water tank
P&T-230-022 Details of lavatory at ground or 1st floor
P&T-230-023 Details of lavatory at 2nd floor
P&T-230-024 Details of kitchens for staff quarter
P&T-230-025 Details of laundry & drying space and pre-cast concrete block
P&T-230-026 Amended steel window details
P&T-230-027 Amended cable trench details
P&T-230-028 Details of rolling shutter (amended)
P&T-230-029 Details of steel S.C. door (amended)
P&T-230-030 Details of bronze letters
P&T-230-001 Ground floor, 1st floor plans and sections
P&T-230-002 Details of hoarding
P&T-230-003 2nd floor & flat roof plans, north & west elevations
P&T-230-004 Block plan, south & east elevations, diagrams & calculations
P&T-230-005 Details of M.S. track & roller
P&T-230-006 Details of cable trench
P&T-230-007 Details of cable trench
P&T-230-008 Details of cable connecting chamber
P&T-230-009 Amended cable connecting chamber detail
P&T-230-010 Details of rolling shutter
P&T-230-011 Details of steel windows
P&T-230-012 Details of doors
P&T-230-013 Ironmongery schedule
P&T-230-014 Details of staircase no.1
P&T-230-015 Details of staircase no.1
P&T-230-016 Details of staircase no.1
P&T-230-017 Details of staircase no.2
P&T-230-018 Details of staircase no.2
P&T-230-019 Details of M/S. gates steel door and M/S. grille
P&T-230-020 Details of hoisting beam and metal louvres
P&T-230-021 Details of R.C. water tank
P&T-230-022 Details of lavatory at ground or 1st floor
P&T-230-023 Details of lavatory at 2nd floor
P&T-230-024 Details of kitchens for staff quarter
P&T-230-025 Details of laundry & drying space and pre-cast concrete block
P&T-230-026 Amended steel window details
P&T-230-027 Amended cable trench details
P&T-230-028 Details of rolling shutter (amended)
P&T-230-029 Details of steel S.C. door (amended)
P&T-230-030 Details of bronze letters