280-level entrance, Ma On Shan mine 馬鞍山礦場280米礦洞口

1958年,馬鞍山礦坡280米處的礦坑入口因山泥傾瀉而堵塞,公司遂於294米處開鑿新入口,仍舊以「280出入口」命名 。New entrance driven in 1958 at 294-metre level of Ma On Shan iron mine to replace the 280-level entrance which is blocked by landslide. This new entrance still bears the name of 280-metre level entrance.
hku lib logo
Contact us 

Copyright © 2024 The University of Hong Kong. All Rights Reserved.