P&T-029-001 General ground floor plan
P&T-029-002 Block plan
P&T-029-003 Electric kitchen on 5th floor
P&T-029-004 Revised column setting out plan
P&T-029-005 Schedule of interior finishes
P&T-029-006 Ground floor plan
P&T-029-007 Details of concrete bridge over scavenging lane
P&T-029-008 Loading and unloading area to extisting factory (including car park)
P&T-029-009 First floor plan
P&T-029-010 Second floor plan
P&T-029-011 Third floor plan
P&T-029-012 Fourth floor plan
P&T-029-013 Fifth floor plan
P&T-029-014 Roof plan
P&T-029-015 Section A-A
P&T-029-016 Section B-B
P&T-029-017 Section C-C
P&T-029-018 Elevation to scavenging lane (south east side)
P&T-029-019 Elevation to scavenging lane (north east side)
P&T-029-020 Elevation to Shing Yip Street
P&T-029-021 Diagram & schedule
P&T-029-022 Drainage & plumbing layout (ground fl. & block plan)
P&T-029-023 Plumbing vertical diagram
P&T-029-024 Details of openings to rec. st. rolling shutters and fusible link equipment
P&T-029-025 Details of steel window & schedule
P&T-029-026 Typical masonry details
P&T-029-027 Details of lavatories
P&T-029-028 1/2" Details of staircase no. 1
P&T-029-029 1/2" Details of staircase no. 2
P&T-029-030 Details of staircase no.2 sec. "A-A" and typical details
P&T-029-031 1/2" Details of staircase no. 3
P&T-029-032 Metal work & R.C. bridge
P&T-029-033 Details of false ceiling at 3rd floor slab
P&T-029-034 Openings from ext'g factory (great eastern) to bridge
P&T-029-035E Plumbing layout (1st to 4th only)
P&T-029-036E Plumbing layout (5th fl. plan)
P&T-029-037E Ground floor plan (including existing factory)
P&T-029-038E First floor plan (including existing factory)
P&T-029-039E Steel door & fire ext. hose reel
P&T-029-040E Details of steel windows
P&T-029-041E Joinery details
P&T-029-042E Plan at ground floor level; elevation to m/s cat ladder at lift pit.
P&T-029-043E 1/2" cross section of M.H & G.T.; 1/2" detail of S.W.G.T. & M.H. (for Textile Alliance Co. Factory)
P&T-029-044E Revised kitchen (fifth floor)
P&T-029-045E Proposed schematic wiring diagram for Mayar Silk Mills New Godown, Lot 1222 DD453, Tsuen Wan
P&T-029-046E Block plan
P&T-029-047E Progress chart
P&T-029-001 General ground floor plan
P&T-029-002 Block plan
P&T-029-003 Electric kitchen on 5th floor
P&T-029-004 Revised column setting out plan
P&T-029-005 Schedule of interior finishes
P&T-029-006 Ground floor plan
P&T-029-007 Details of concrete bridge over scavenging lane
P&T-029-008 Loading and unloading area to extisting factory (including car park)
P&T-029-009 First floor plan
P&T-029-010 Second floor plan
P&T-029-011 Third floor plan
P&T-029-012 Fourth floor plan
P&T-029-013 Fifth floor plan
P&T-029-014 Roof plan
P&T-029-015 Section A-A
P&T-029-016 Section B-B
P&T-029-017 Section C-C
P&T-029-018 Elevation to scavenging lane (south east side)
P&T-029-019 Elevation to scavenging lane (north east side)
P&T-029-020 Elevation to Shing Yip Street
P&T-029-021 Diagram & schedule
P&T-029-022 Drainage & plumbing layout (ground fl. & block plan)
P&T-029-023 Plumbing vertical diagram
P&T-029-024 Details of openings to rec. st. rolling shutters and fusible link equipment
P&T-029-025 Details of steel window & schedule
P&T-029-026 Typical masonry details
P&T-029-027 Details of lavatories
P&T-029-028 1/2" Details of staircase no. 1
P&T-029-029 1/2" Details of staircase no. 2
P&T-029-030 Details of staircase no.2 sec. "A-A" and typical details
P&T-029-031 1/2" Details of staircase no. 3
P&T-029-032 Metal work & R.C. bridge
P&T-029-033 Details of false ceiling at 3rd floor slab
P&T-029-034 Openings from ext'g factory (great eastern) to bridge
P&T-029-035E Plumbing layout (1st to 4th only)
P&T-029-036E Plumbing layout (5th fl. plan)
P&T-029-037E Ground floor plan (including existing factory)
P&T-029-038E First floor plan (including existing factory)
P&T-029-039E Steel door & fire ext. hose reel
P&T-029-040E Details of steel windows
P&T-029-041E Joinery details
P&T-029-042E Plan at ground floor level; elevation to m/s cat ladder at lift pit.
P&T-029-043E 1/2" cross section of M.H & G.T.; 1/2" detail of S.W.G.T. & M.H. (for Textile Alliance Co. Factory)
P&T-029-044E Revised kitchen (fifth floor)
P&T-029-045E Proposed schematic wiring diagram for Mayar Silk Mills New Godown, Lot 1222 DD453, Tsuen Wan
P&T-029-046E Block plan
P&T-029-047E Progress chart